550 East Colorado Blvd.
David Sinclair
The project would involve the construction of an 112,252- square-foot, five-story medical office and retail building. As proposed, the ground floor would contain 16,201 square feet of retail space and lobby. The remaining four levels would consist of approximately 95,051 square feet of medical office space and common areas. The building would be 86 feet, 7 inches high and would be in an L shape from the second floor upward, spanning the northern and eastern parts of the site. The main lobby entrance would be at the norhteast corner of the building. The east side of the building wold be set back about 14 feet to provide space for the canopies of existing street trees on Madison Avenue.
A six-level subterranean parking garage is proposed (one level at grade and five subterranean levels). ADA accessible parking spaces would be on the ground level; 476 total parking spaces would be provided. The floor of the lowest underground parking level would be roughly 56 feet below grade. Access to and from the parking structure wold be from separate entrance and exit driveways that would provide access to and from Converse Alley.
Documents Available for Review:
Notice of Availability and Public Meeting Notice of Public Hearing for Planning Commisison - April 24, 2013
Final Environmental Impact ReportSubsequent Draft Environmental Impact Report Table of Contents 1. Executive Summary 2. Introduction 3. Project Description 4. Environmental Setting 5.1 Air Quality 5.2 Cultural Resources 5.3 Greenhouse Gas Emissions 5.4 Noise 5.5 Transportation and Traffic 6. Significant Unavoidable Adverse Impacts 7. Alternatives to the Proposed Project 8. Impacts Found not to be Significant 9. Significant Irreversible Changes Due to the Proposed Project 10. Growth-Inducing Impacts of the Proposed Project 11. Organizations and Persons Consulted 12. Qualifications of Persons Preparing EIR 13. Bibliography Appendix A – Notice of Preparation (NOP) and Initial Study Appendix B – NOP Comments Appendix C – Air Quality and GHG Emission Modeling Data Appendix D – Historic Resources Analysis Report Appendix E – Noise Modeling Data Appendix F.1 – Traffic Impact Analysis Appendix F.2 – Traffic Impact Study Appendix F.3 – Traffic Study Addendum Crown City Medical Center – Initial Study (2011) Notice of Preparation and Scoping Meeting Conditional Use Permit #4537 – Initial Study (2006)